Construction of 19 log and heavy timber balconies, roof top cupolas, pergolas and landscape elements on newly-built 4 storey, 71 unit condo. Our joinery standard was modified to match into existing joinery on Phase 1 & 2 built pre-great recession. All connection detailing was completed by Tyee and ISL Engineering. Included in our scope was 2700 linear feet of log handrails. Details here were improved to lower maintenance constructed in the first two phases.