Working with the owner, BCMP Architects and New Dawn Developments, we completed heavy timber connection detailing during design of the 68 unit condo-hotel. Tyee pre-fabricated and installed the 70,000FBM timber hybrid structure consisting of 20 four storey balconies, lower covered roofs, entries, accent pieces and lobby timbers over several months. Included in our scope was the installation of 12,000 FBM of timber decking. Connections consisted of bolted with concealed metal plates, split ring reinforcement and some traditional timber joinery, to match into the architect’s vision for the contemporarily designed ski-hill condo.